Home      PRODUCT     Mud Pump Spare Parts     Power End Parts       National 12-P-160 Mud Pump Replacement C


« Back To Product Center
Category: Power End Parts
  • National 12-P-160 Mud Pump Replacement Crosshead Assembly (P/N 1293026)
  • National 12-P-160 Mud Pump Replacement Crosshead Assembly (P/N 1293026)
  • National 12-P-160 Mud Pump Replacement Crosshead Assembly (P/N 1293026)
National 12-P-160 Mud Pump Replacement Crosshead Assembly (P/N 1293026)National 12-P-160 Mud Pump Replacement Crosshead Assembly (P/N 1293026)National 12-P-160 Mud Pump Replacement Crosshead Assembly (P/N 1293026)

National 12-P-160 Mud Pump Replacement Crosshead Assembly (P/N 1293026)

Product Description:

Premium Replacement Crosshead for National / NOV 12-P-160 Mud Pump (P/N 1293026)

The 12-P-160 1,600 HP triplex mud pump is the backbone of deep-drilling operations worldwide. In severe drilling regimes, the crosshead assembly converts connecting rod angularity into linear motion under immense cyclic thrust. When crosshead slide surfaces experience scoring from contaminated lube oil, or the crosshead pin bore suffers out-of-round deformation, pump balance is compromised.

Our drop-in aftermarket crosshead engineered for the National / NOV 12-P-160 Triplex Mud Pump (Part Number: 1293026 / 1293026-001) offers drilling rig operators and rebuild facilities immediate delivery, API-certified metallurgical strength, and significant cost savings.

Need Urgent Rig-Site 12-P-160 Parts?

Get a fast quote for P/N 1293026 with verified stock availability and air-freight dispatch within 48 hours.

Request a Quote / Inquire Now

Technical Specifications & OEM Cross-Reference

Engineering Parameter OEM Specification Aftermarket Replacement Standard Compliance & Tolerance
OEM Cross-Reference P/N 1293026 / 1293026-001 PN-1293026-EQ 100% Interchangeable
Applicable Mud Pump National / NOV 12-P-160 12-P-160 Triplex Power End Direct Drop-in Fit
Base Material Grade High-Grade Cast Alloy ASTM A536 80-55-06 / QT600-3 Optimized Yield Strength
Crosshead Pin Bore Tolerance Precision Machined ISO H7 Precision Standard Optimized Surface Roughness
Slide Guide Surface Geometry Symmetrical Dual-Slide Precision Cylindrical Ground Strict Surface Flatness
Rated Continuous SPM 120 SPM 120 SPM rated Dynamic Balance Optimized
Compliance Standards API Spec 7K API 7K / ISO 9001 / CE Full Material Traceability

Manufacturing Standards & Rigorous Quality Control

Our manufacturing processes meet heavy industrial duty cycles through strict quality safeguards:

  • Precision CNC Machining: Machined on 5-axis horizontal boring and milling centers in a temperature-controlled shop to eliminate thermal drift on the critical crosshead pin bore and extension rod mounting faces.
  • Dual-Plane Dynamic Balancing: Crosshead castings are dynamically balanced to mitigate reciprocating vibration harmonics across 1,600 HP continuous duty cycles.
  • 100% Surface & Subsurface Inspection: Every unit undergoes hydrostatic pressure checks for hydraulic internal passages, along with 100% Wet Fluorescent Magnetic Particle Testing.

Maintenance & Refurbishment Installation Guidelines

When conducting a complete power end rebuild on a 12-P-160:

  • Pin-to-Bore Fit Verification: Confirm that the interference/clearance fit between the crosshead pin (P/N 1293028) and the crosshead bore complies with OEM technical manual limits.
  • Extension Rod Alignment: Torque the extension rod / intermediate rod to the front face of the crosshead using calibrated torque wrenches. Verify that radial runout meets strict engineering tolerances during complete stroke cycling.
  • Guide Rail Shimming: Inspect upper and lower frame guide plates for wear steps. Re-shim or replace worn guide liners to maintain consistent alignment.

Frequently Asked Questions (FAQ)

Q: Can this crosshead (P/N 1293026) directly replace OEM parts without changing the guide shoes or pins?

A: Yes. This aftermarket crosshead is a direct drop-in replacement built to exact OEM geometry, accommodating OEM crosshead pins, bronze guide shoes, and crosshead extension rods.

Q: What is the typical lead time for international emergency rig-down orders?

A: Standard 12-P-160 crossheads are kept in strategic stock and can be crated and dispatched via air freight within 48 hours to minimize rig NPT.

Q: How do you verify material integrity against crack propagation?

A: Each casting is produced under strict metallurgical control with verified nodularity, Charpy V-Notch impact testing, and complete Ultrasonic Testing (UT) to ASTM A609 level 2.

Need Professional Technical Support or Quote?

Contact TSS-TUP engineering sales team today for stock availability, MTC certificates, and rapid global delivery.

Disclaimer: All manufacturer names, symbols, part numbers (e.g., National, NOV, 12-P-160, P/N 1293026), and descriptions are used solely for cross-reference, identification, and compatibility purposes. Our parts are independent, high-grade aftermarket replacement components conforming to API Spec 7K and are neither manufactured nor endorsed by the OEM.

OEM Quality Standard
API RP 13C Screen Designation
Heavy-Duty Metal Mesh & Frame
Direct Replacement for Global Rigs
Field-Proven in Middle East Rigs
Quick Part Search

Need Technical Drawing Verification?

Contact our engineers for exact part numbers or API RP 13C mesh size matching.

Inquire Engineers »
Direct Contact
Contact: Rhea Feng
WhatsApp: +86-13724067868
Location: Jiuyang Avenue, South City Development Area Jingzhou District, Jingzhou City Hubei Province 434000 Peoples Republic of China
Leave a message

Facebook

Twitter

Linkedin

Youtube

whatsapp

Email

Phone

Top