Home      PRODUCT     Solids Control Spare Parts     Other Solids Control Parts       Heavy-Duty Slurry Elbow for Bauer P/N 20


« Back To Product Center
Category: Other Solids Control Parts
  • Heavy-Duty Slurry Elbow for Bauer P/N 209818 | MAT Spares

Heavy-Duty Slurry Elbow for Bauer P/N 209818 | MAT Spares

Product Description:

High-Performance Double 90° Slurry Elbow Replacement for Bauer P/N 209818

Heavy-Wall Double 90° Offset Pipe Spool | 100% Bolt-on Fit for Bauer MAT BE Plants

Disclaimer: All manufacturer names, symbols, part numbers (including Bauer, MAT, BE 100, BE 170, BE 250, BE 400, BE 500, BC 35, P/N 209818, and PN 209818), and descriptions are referenced strictly for cross-reference, technical identification, and mechanical compatibility purposes. Our parts are independent, high-grade aftermarket replacement pipeline components and are neither manufactured nor endorsed by the OEM.

Engineering Deconstruction & Hydro-Wear Protection

In continuous diaphragm wall trenching, heavy civil piling, and bentonite recycling, desanding plant piping endures continuous two-phase flow erosion. Centrifugal feed pumps push abrasive quartz sands and drill cuttings through circulation manifolds at high velocities. When standard-wall flowline elbows (OEM Part Number: 209818 / P/N 209818 / MPN 209818) face aggressive slurry turbulence, centrifugal force drives dense solids against the pipe extrados (outer bend radius), causing severe wall thinning and unexpected washout punctures.

A blown elbow on an active mud plant releases pressurized bentonite slurry across the site, contaminating nearby equipment and bringing deep foundation excavation to an immediate halt. Sourcing replacement double elbows through conventional OEM dealership routes frequently entails 10-to-16-week lead times and high list prices.

Our precision-welded Heavy-Wall Double 90° Offset Slurry Elbow Assembly (Cross-Reference Part Number: 209818 / PN 209818-EQ) combines heavy-gauge seamless alloy steel with optimized hydraulic bend geometry, ensuring 100% bolt-on compatibility with Bauer MAT slurry treatment plants at a 35–45% procurement cost reduction.

Technical Specifications & OEM Cross-Reference

Engineering Parameter OEM Baseline Specification Aftermarket Replacement Standard Compliance & Tolerance
OEM Cross-Reference P/N 209818 / PN 209818 PN-209818-EQ 100% Direct Bolt-on Fit
Compatible Machinery Bauer MAT Desanding Plants BE 100, BE 170, BE 250, BE 400, BE 500 Drop-in Replacement
Component Category Double 90° Offset Mud Pipe Spool Heavy-Duty Flanged Slurry Elbow API Spec 13C Compliant
Nominal Diameter (DN) DN150 (6") / DN200 (8") DN150 / DN200 Standard Bore Full Bore Flow Path
Pipe Base Material Carbon Steel Pipe ASTM A106 Gr.B / Q355B Heavy Wall Tensile: ≥ 415 MPa
Nominal Wall Thickness 6.0 mm – 8.0 mm 10.0 mm – 12.0 mm (Heavy Extrados) ISO 4200 Heavy Schedule
Bend Radius Ratio Standard Long Radius (R ≈ 1.5D) Smooth Hydraulic Arc Low Friction Drop
Working Pressure Rating 1.0 MPa (145 psi) 1.6 MPa (232 psi) Pulse Rated Hydrostatic Proof: 2.5 MPa
Flange Connection Standard Bauer Metric Multi-Hole Pattern DIN EN 1092-1 Type 01 / ASME B16.5 CNC Hole Alignment (± 0.2 mm)
Protective Coating System Basic Primer Paint Sa 2.5 Sandblast + Dual Epoxy Polyurethane Dry Film Thickness: ≥ 200 μm

Manufacturing Standards & Quality Control

  • Continuous Full-Penetration Welds: The intermediate offset junction and flange neck welds are executed using automated submerged arc welding (SAW) and argon-shielded root passes, inspected to ISO 5817 Level B standards to absorb intense 6.0G+ high-frequency vibrations from surrounding dewatering screens.
  • Reinforced Extrados Wall Schedule: Formed from heavy-wall seamless steel pipe with calibrated outer-curve wall thickness (10.0 – 12.0 mm), ensuring an added wear allowance against sharp quartz sand erosion and transient water-hammer spikes up to 1.6 MPa.
  • Precision CNC Flange Facing: Mating flanges undergo finish-machining after complete welding assembly, achieving a surface flatness tolerance ≤ 0.3 mm to eliminate flange distortion and stress during bolting.

Maintenance & Refurbishment Installation Guidelines

  1. Gasket Channel Alignment: Thoroughly scrape and clean existing manifold flange faces to remove dried bentonite caking. Install wire-reinforced or heavy EPDM full-face gaskets between the double elbow flanges and connecting pipework.
  2. Cross-Pattern Flange Torquing: Tighten high-tensile flange bolts (Grade 8.8) incrementally using a cross-star torque sequence to avoid uneven mechanical stress on the pipe spool body. Re-verify bolt torque after the initial 12 hours of mud circulation.
  3. Ultrasonic Thickness Monitoring: Establish an ultrasonic thickness measurement (UTM) grid along the outer bend curve. Log baseline readings at commissioning; schedule preventive replacement when local wall thinning reaches 40% of original nominal thickness.

Frequently Asked Questions

Q: Can this double elbow (P/N 209818) be bolted into Bauer MAT plants without altering connecting pipework?

A: Yes. Center-to-face dimensions, offset drop height, flange outer diameter, and bolt-circle patterns match original Bauer P/N 209818 engineering drawings, ensuring direct interchangeability.

Q: How does the heavy-wall design handle high-density sand slurries from trench cutters?

A: With heavy 10.0 – 12.0 mm seamless ASTM A106 Gr.B construction and a smooth 1.5D bend radius, this assembly minimizes turbulent eddies, distributing particle impact across a broader curve to prevent localized washout.

Q: What inspection certificates are supplied with every replacement unit?

A: Each shipment includes an EN 10204 3.1 Material Test Certificate, 2.5 MPa hydrostatic pressure test records, ultrasonic wall thickness verification sheets, and weld NDT inspection reports.

Need Slurry Elbows for Bauer P/N 209818 or Desander Spares?

Contact TSS-TUP engineering sales team today for technical consultation, material compliance certificates, and fast global dispatch.

Keywords: Bauer 209818 mud elbow replacement, double 90 degree offset pipe spool, P/N 209818, PN-209818-EQ, Bauer MAT BE 250 slurry elbow.
OEM Quality Standard
API RP 13C Screen Designation
Heavy-Duty Metal Mesh & Frame
Direct Replacement for Global Rigs
Field-Proven in Middle East Rigs
Quick Part Search

Need Technical Drawing Verification?

Contact our engineers for exact part numbers or API RP 13C mesh size matching.

Inquire Engineers »
Direct Contact
Contact: Rhea Feng
WhatsApp: +86-13724067868
Location: TSS-TUP R&D and Manufacturing Base (Direct Production Facility under TSS-TUP) Zone A, Jinyue Industrial Park, Huafu Avenue, Raoyang County, Hengshui, Hebei Province, China TSS-TUP Global Export & Operations Center (Direct In-House Export Arm under TSS-TUP) No. 1 Courtyard, Yanjiao Industrial Avenue, Sanhe, Langfang, Hebei Province, China
Leave a message

Facebook

Twitter

Linkedin

Youtube

whatsapp

Email

Phone

Top